Traditional Shipwright Services

Teal

16ft Summers and Payne built in 1893

Teal was brought in for a good spruce up. But after closer inspection we discovered she needed all her frame ends replacing and new fabricated floors. So we took the keel off, the floors were removed and sections scarfed into the frames, new floors were then fitted. The whole inside paint work was stripped to bare and re-painted. All bright work was stripped to bare and re-varnished. The old pine deck renovated and the topsides faired and painted, the mast stripped and varnished and she had a new gaff and boom.