Traditional Shipwright Services

Chris Craft (Capri)

The Owner bought her in to us for the hull to be striped and re-varnished and for the deck to be re-varnished. We removed all the chrome fittings and heat gunned the varnish from the hull, sanded the hull to remove all traces of the varnish, replaced dowels that had fallen out and then applied two coats of oil based stain. once dry we applied 8 coats of Epifanes PP varnish and 6 coats of Epifanes two pack gloss. The deck was rubbed and two coats of Epifanes single pack gloss applied